After 17 months of construction, the bridge reopened in the last few days. Local residents and weekend drivers have already graced the new bridge with their traffic.
Currently the only closing recorded by the National Park Service is the stretch between Milepost 269.8 - 280.9 – which is between Highway 16 to the North and Highway 421 to the South. Below is a link to the NPS website.
http://www.nps.gov/blri/planyourvisit/roadclosures.htm
Marc White
Marketing Specialist, ABR, GRI, ePro
Broker/REALTOR
Direct 828-406-2134
Marc@CedarFallsRealty.com
Sunday, September 20, 2009
Finally, the Goshen Creek Bridge, on the Blue Ridge Parkway is open again.
Labels:
Blue Ridge Parkway,
construction,
north carolina,
watauga
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment